Jorge prepares to baptize a man. The recent heavy rains caused rapid flow and required extra caution.
Friday, July 18, 2008
Tuesday, July 8, 2008
In May of 2008, Jorge and Gloria gave up one of their bedrooms to enlarge the worship auditorium used by the church. The east wall of the garage was removed and the former bedroom became the front of the auditorium. It doubled the size of the auditorium. Still, with the rapid growth of the congregation, there are sometimes people sitting outside.
Subscribe to:
Posts (Atom)
